More value from the people and equipment you already have. We work on the shop floor, with your people and without major investment.
You choose the challenge that costs you most. Together with your team we solve it to a measured target.
At the start we write the target as a number, for example changeover time from 75 to 30 minutes. We work on the shop floor, with your people and without major investment. What works, we write down as a standard so that it stays.
Choose your challenge from:
- bottleneck and flow
- changeovers and batch sizes
- scrap and rework
- equipment reliability
- lead time and on-time delivery
- labour productivity in assembly
- internal logistics and order
- onboarding new workers
- Week 1Baseline: we measure on the shop floor together with your team.
- Week 2Root causes and a calculation in euros.
- Weeks 3–5We test the measures on the shop floor and adjust them until they work.
- Week 6Measured result, standard and a proposal for the next step.
A production that keeps improving even when you are not on the shop floor.
Supervisors learn to spot problems themselves, find the root cause and remove it the same week. We cascade the board’s targets down to every department, so everyone knows what they measure and why.
- AssessmentMaturity of production management in eight areas and baseline indicators.
- TargetsTwo or three annual targets in numbers, cascaded by department.
- Model areaWorkplace organisation with 5S, a daily board meeting, standard work and root-cause problem solving.
- Roll-outWe extend the system to other departments in waves. Kaizen becomes a habit: small daily improvements proposed by people on the shop floor.
- HandoverInternal owner, reassessment and a plan for the next year.
We measure in euros and in people:
- manufacturing cost per unit
- on-time delivery
- scrap
- share of supervisors who run the system without us
In practiceAt a food manufacturer, re-measured process times showed that the product that looked best was actually losing money. Once capacity was shifted to more profitable products, revenue grew by 8 % even though that product’s volume fell by 40 %. Read the case study ↗
The objective
Build a manufacturing operation that is efficient, flexible and structurally competitive.
Signs this service is for you
- orders wait while machines and people are not fully used
- changeovers take too long, so batches grow
- scrap and rework have become normal
- improvements last only while someone pushes them
Frequently asked questions
What is the difference between Lean Sprint and Lean System?
Lean Sprint solves one challenge to a measured target in four to six weeks. Lean System, over four to six months, teaches your managers to spot and fix problems themselves.
Do we need new machines?
No. We work with your people and existing equipment, without major investment.
How is it priced?
We only propose a measure if its planned annual effect is at least five times the implementation price. You pay half at the start. The variable part is normally 10% of the effect achieved and never more than three times the implementation price.